P.I.M.E. Missonary 
Headquarters & Residence

Scope

DiClemente Siegel Engineers worked with Systemp in a Team-Construct relationship. Job was over budget as designed. Systemp offered concept to reduce cost and maintain the same number of control zones as originally designed.

Systemp Solution

Water-source heat-pump job with internally mounted fluid cooler. Thirty water-source heat-pump units and fifty zones of control. 

Project Inquiry

  • Slide Title

    Write your caption here

    Button

Sacred Heart Rehabilitation Center

Scope

50 year old three story building with no air conditioning. Customer houses and rehabilitates drug and alcohol addicts. Customer needed to provide air conditioning to obtain full state funding.

Systemp Solution

Converted old Hot water heating system to water source heat pump system. Central system was installed to air condition the whole facility. Reused existing piping system and saved over $800,000 in construction costs.

Power feed to building was less than the electrical code would allow Systemp Controls Division installed power monitoring system to shed loads when the loads go over code accepted levels which was approved by state inspector

Project Inquiry

  • Slide Title

    Write your caption here

    Button
  • Slide Title

    Write your caption here

    Button
  • Slide Title

    Write your caption here

    Button
  • Slide Title

    Write your caption here

    Button

ULTIMATE SOCCER ARENA

Scope

Customer required an air conditioned facility. Energy consumption was key to reduce operating cost. Customer required an energy management system.

Systemp Solution

Independent heating and air conditioning systems.  The independent heating system used less horsepower to operate. The independent air conditioning system reduced maintenance costs.

Project Inquiry

  • Slide Title

    Write your caption here

    Button
  • Slide Title

    Write your caption here

    Button

FEV ENGINE TEST FACILITY

Scope

Design & Build Project

Dynamometer test facility with fourteen test cells for engines up to 400 hp.

Systemp Solution

Custom ventilation system to cool room with process water cooling system for engines. DDC control system to manage air and water systems.